锐单电子商城 , 一站式电子元器件采购平台!
  • 电话:400-990-0325

EVM2NSX80B12

EVM2NSX80B12

数据手册.pdf
Panasonic 松下 电阻

PANASONIC ELECTRONIC COMPONENTS  EVM2NSX80B12  微调电位器, 100Ω, 25%, 0.15W

值Resistance | 100Ω/Ohm \---|--- 额定功率Power| 0.15W 容差Tolerance| ±25% 温度系数Temperature Coefficient| ±250 ppm/°C 圈数Number of Turns| 单圈 Single 调节类型Adjustment Type| 顶部调节 Top Adjustment 端子类型Termination Style| J引线 J Lead Description & Applications| ●2 mm Square Low-Profi le SMT Trimmer Potentiometers Cermet, Open Frame Type ● Low-profi le 0.7 mm 0.75 mm max. EVM2T 0.81 mm 0.95 mm max. EVM2N 1.05 mm 1.2 mm max. EVM2W ● Automatic adjustment type EVM2W ● High reliability realized by cermet element ● Ex cellent mountability ● Conforms to JIS C5260-1:1999 ■ Recommended Applications ● Audio/visual, offi ce, and communication equipment ● General electronic equipment 描述与应用| ●2毫米贴片微调 (陶瓷,开架式) ●器件薄,低厚度 0.7毫米(0.75毫米最大。)EVM2T EVM2N0.81毫米(0.95毫米最大。) 1.05毫米(1.2毫米最大。)EVM2W ●自动调整型(EVM2W) ●高可靠性实现了金属陶瓷元件 ●防爆CELLENT安装性 ●符合JIS电子设备用电位计-1:1999 ■推荐应用 ●音频/视觉,OFFI CE和通信设备 ●一般电子设备

EVM2NSX80B12中文资料参数规格
技术参数

额定电压DC 50.0 V

容差 ±25 %

额定功率 150 mW

电阻 100 Ω

阻值偏差 ±25 %

工作温度Max 100 ℃

工作温度Min -40 ℃

封装参数

安装方式 Surface Mount

封装 2X2

外形尺寸

长度 2.2 mm

宽度 2.81 mm

高度 0.81 mm

封装 2X2

物理参数

温度系数 ±250 ppm/℃

其他

产品生命周期 Unknown

包装方式 Tape & Reel TR

制造应用 音频, Industrial, Audio, 工业, Communications & Networking, 通信与网络, 一般电子设备

符合标准

RoHS标准 RoHS Compliant

REACH SVHC标准 No SVHC

REACH SVHC版本 2015/06/15

EVM2NSX80B12引脚图与封装图
EVM2NSX80B12引脚图

EVM2NSX80B12引脚图

EVM2NSX80B12封装图

EVM2NSX80B12封装图

EVM2NSX80B12封装焊盘图

EVM2NSX80B12封装焊盘图

在线购买EVM2NSX80B12
型号 制造商 描述 购买
EVM2NSX80B12 Panasonic 松下 PANASONIC ELECTRONIC COMPONENTS  EVM2NSX80B12  微调电位器, 100Ω, 25%, 0.15W 搜索库存